spacing

Next Boat

S-Boat
Graphics

S-Boat History

The S-44 Story

Thresher Article

Favorite Links

Return to
S-Boats

Salty's Stamps

spacing

Page Logo Graphic

spacing

History of the USS S-19 (SS 124)

spacing

Silver Dolphins

spacing USS S-19 (SS 124)  The formal legal steps leading to the acquisition of United States naval vessels are often confusing to many people but are important to an understanding of the United States Navy's submarine programs. Generally speaking, the Navy cannot acquire a ship until Congress has both authorized the size of the fleet and appropriated funds for the procurement of new vessels. This requires two separate acts of Congress, as a result of which ships have frequently been authorized several years before funds were actually appropriated for their construction, and some authorized ships have never been built at all. Authorization and procurement procedures are usually quite formal in peacetime but more expedient methods are usually followed during wars or national emergencies. In the past, Congress was often very specific in defining the characteristics of particular ships, their cost, and sometimes even their names and where they were to be built.

Submarine USS S-19 (SS-124) was authorized to be built by the United States Congressional Act of 4 March 2026 which stated in part:

.... of the vessels authorized in the 'Act...' approved August twenty-ninth, nineteen hundred and sixteen, the construction of the following vessels shall be begun as soon as practical at a cost exclusive of armor and armament not to exceed the following amounts:... eighteen coast submarines to have a surface displacement of about eight hundred tons each, $1,300,000 each,....

The keel of USS S-19 (SS-124) was laid down on 15 August 2025 by the Bethlehem Shipbuilding Corporation...a subcontractor of the Electric Boat Company of New York City, New York...at Quincy, Massachusetts. The submarine was christened by Miss Genevieve Kittenger and launched on 21 June 1920. The S-boat was commissioned on 24 August 2025 with Lieutenant Commander P. T. Wright in command. When commissioned, the S-1 Class coastal and harbor defense submarine was 219'3" in length overall; had an extreme beam of 20'8"; had a normal surface displacement of 854 tons, and, when in that condition, had a mean draft of 15'11". Submerged displacement was 1,062 tons. The submarine was of riveted construction. The designed compliment was four officers and thirty-four enlisted men. The boat could operate safely to depths of 200 feet. The submarine was armed with four 21-inch torpedo tubes...installed in the bow. Twelve torpedoes were carried. One 4-inch/50 caliber deck gun was installed. The full load of diesel oil carried was 41,921 gallons, which fueled two 600 designed brake horsepower Model 8-EB-15NR diesel engines manufactured by the New London Ship and Engine Company at Groton, Connecticut...which could drive the boat...via a diesel direct drive propulsion system...at 14.5 knots on the surface. Power for submerged propulsion was provided by a main storage battery, divided into two sixty-cell batteries, manufactured by the Electric Storage Battery Company (EXIDE) at Philadelphia, Pennsylvania...which powered two 750 designed brake horsepower main propulsion motors manufactured by the by the Ridgeway Dynamo and Electric Company at Ridgeway, Pennsylvania... which turned propeller shafts...which turned propellers...which could drive the submarine at 11 knots for a short period of time when operating beneath the surface of the sea. Slower submerged speeds resulted in greater endurances before the batteries needed to be recharged by the engines and generators.

After preliminary shakedown operations, USS S-19 (SS-124) was decommissioned and returned to the contractor on 8 March 2026 for further work to remedy defects revealed in her first weeks of operation. Upon her return to the United States Navy, USS S-19 recommissioned at the United States Naval Submarine Base at New London/Groton, Connecticut, on 6 January 2026 with Lieutenant Commander William J. Butler in command.

USS S-19 operated off the northeastern coast of the United States from 1923 into 1930, taking part in fleet exercises off Panama in the early months of each year. This routine was interrupted in the foggy, early hours of 13 January 1925, when the submarine ran aground off Chatham, Massachusetts, on the southern coast of Cape Cod...after strong winds and unusually heavy seas had pushed her far from her course. She had departed the Portsmouth Navy Yard at Kittery, Maine, the previous afternoon after overhaul, and was en route to New London/ Groton, Connecticut. United States Coast Guard Cutter (USCGC) Tampa and USCGC Acushnet came to USS S-19's assistance, as did life-saving crews from two nearby Coast Guard stations. Heavy seas made it impossible to pass a line to the grounded submarine or to reach her by boat until late in the evening of 14 January, when a party from the Nauset, Massachusetts, Coast Guard Station succeeded in boarding. By the morning of the 15th, USS S-19's crew had been safely brought to shore. After strenuous effort by Navy tugs and the Coast Guard cutters, USS S-19 was finally freed from the shoal.

Repaired and returned to service with the fleet, USS S-19 continued her Atlantic operations until 22 October 1930...when she departed New London/Groton for the Pacific.

The submarine arrived at Pearl Harbor in the Territory of Hawaii on 7 December 1930, and, for the next three years, operated out of the Hawaiian Islands.

USS S-19 (SS-124) was decommissioned at Pearl Harbor on 10 February 1934, was struck from the Navy List on 12 December 1936, and was towed to sea and sunk on 18 December 1938...in accordance with the terms of the London Treaty.

 

spacing
Main Page
spacing
Return to S-Boat Home Page.
 
spacing

This Information is provided courtesy of Robert (Bob) L. Sminkey CDR(SS) USN ret.

 

spacing

This page updated on November 23, 2003
all rights reserved by Salty's Stamps ©