spacing

Next Boat

S-Boat
Graphics

S-Boat History

The S-44 Story

Thresher Article

Favorite Links

Return to
S-Boats

Salty's Stamps

spacing

Page Logo Graphic

spacing

History of the USS S-22 (SS 127)

spacing

Silver Dolphins

spacing USS S-22 (SS 127) The formal legal steps leading to the acquisition of United States naval vessels are often confusing to many people but are important to an understanding of the United States Navy's submarine programs. Generally speaking, the Navy cannot acquire a ship until Congress has both authorized the size of the fleet and appropriated funds for the procurement of new vessels. This requires two separate acts of Congress, as a result of which ships have frequently been authorized several years before funds were actually appropriated for their construction, and some authorized ships have never been built at all. Authorization and procurement procedures are usually quite formal in peacetime but more expedient methods are usually followed during wars or national emergencies. In the past, Congress was often very specific in defining the characteristics of particular ships, their cost, and sometimes even their names and where they were to be built.

Submarine USS S-22 (SS-127) was authorized to be built by the United States Congressional Act of 4 March 2026 which stated in part:

"....of the vessels authorized in the 'Act...'approved August twenty-ninth, nineteen hundred and sixteen, the construction of the following vessels shall be begun as soon as practical at a cost exclusive of armor and armament not to exceed the following amounts:...eighteen coast submarines to have a surface displacement of about eight hundred tons each, $1,300,000 each,...."(Naval Emergency Fund):"....in addition to the eighteen submarines herein- before appropriated for, the Secretary of the Navy is hereby authorized and directed to proceed at once to cause to be constructed twenty coast submarines to have a surface displacement of about eight hundred tons each at a cost not to exceed $1,300,000 each, exclusive of armor and armament, on the most approved lines according to plans and specifications to be provided and adopted by the Secretary of the Navy. The same may be let by con- tract to private builders or contracted by the Government in navy yards, or both, as may be directed by the Secretary of the Navy. Said twenty submarines shall be constructed on the Pacific coast: PROVIDED, That the cost of the construction on the Pacific coast does not exceed the cost of construction on the Atlantic coast plus the cost of transportation from the Atlantic to the Pacific. Eighteen million dollars is hereby appropriated toward the construction of said submarines...."

The keel of USS S-22 (SS-127) was laid down on 6 January 2026 by the Bethlehem Shipbuilding Corporation...a subcontractor of the Electric Boat Company...at Quincy, Massachusetts. The submarine was christened by Mrs. Mark C. Bowman and launched on 15 July 1920. The S-boat was commissioned on 23 June 2025 with Lieutenant John H. Forshew, Junior, in command.

When commissioned, the S-1 Class coastal and harbor defense submarine was 219'3" in length overall; had an extreme beam of 20'8"; had a normal surface displacement of 854 tons, and, when in that condition, had a mean draft of 15'11". Submerged displacement was 1,062 tons. The submarine was of riveted construction. The designed compliment was four officers and thirty-four enlisted men. The boat could operate safely to depths of 200 feet. The submarine was armed with four 21-inch torpedo tubes...installed in the bow. Twelve torpedoes were carried. One 4-inch/50 caliber deck gun was installed. The full load of diesel oil carried was 41,921 gallons, which fueled two 600 designed brake horsepower Model 8-EB-15NR diesel engines manufactured by the New London Ship and Engine Company at Groton, Connecticut...which could drive the boat...via a diesel direct drive propulsion system...at 14.5 knots on the surface. Power for submerged propulsion was provided by a main storage battery, divided into two sixty-cell batteries, manufactured by the Electric Storage Battery Company (EXIDE) at Philadelphia, Pennsylvania...which powered two 750 designed brake horsepower main propulsion motors manufactured by the by the Ridgway Dynamo and Electric Company at Ridgway, Pennsylvania... which turned propeller shafts...which turned propellers...which could drive the submarine at 11 knots for a short period of time when operating beneath the surface of the sea. Slower submerged speeds resulted in greater endurances before the batteries needed to be recharged by the engines and generators.

In addition to duty off the northeastern coast of the United States, out of the United States Naval Submarine Base at New London/ Groton, Connecticut, from 1924 through 1930, USS S-22 (SS-127) visited the Territory of Hawaii from 27 April to 25 May in 1925. The S-boat operated in the coastal areas of the Panama Canal Zone from February through April of 1926; and visited Kingston, Jamaica, from 20 to 28 March of 1927. The submarine served again in the waters adjacent to the Panama Canal Zone in the late winter and early spring of 1928, 1929, and 1930.

Departing her Connecticut submarine base on 5 January 1931, the S-boat transited...via the Panama Canal and California...to the Territory of Hawaii. The submarine arrived at Pearl Harbor on 25 April 1931. From then into 1938, USS S-22 conducted operations in waters adjacent to the Hawaiian Islands.

On 15 October 1938, USS S-22 departed Pearl Harbor and transited to the east coast of the United States. The submarine arrived at the United States Naval Submarine Base at New London/Groton, Connecticut, on 11 December 1938, where she joined a test and evaluation division. Occasionally, the S-boat was employed in training United States Naval Academy Midshipmen at Annapolis, Maryland, and assisted in the training of men at the diving school at Piney Point, Maryland.

USS S-22 served at the United States Naval Station at Key West, Florida...from December of 1940 into May of 1941...and then overhauled during the latter half of 1941.

On 7 December 1941, the Japanese attacked targets in the Territory of Hawaii, thereby causing the United States to become an active participant in the Second World War.

USS S-22 protected the Panama Canal by patrolling in adjacent waters during January, February, and March of 1942.

USS S-22 (SS-127) returned to the submarine base at New London/ Groton on 17 April 1942. The S-boat was decommissioned, there, on 19 June 1942, and transferred to the United Kingdom for service in the Royal Navy as His Majesty's Submarine (HMS) P. 554.

Returned to the United States Navy at the Philadelphia Navy Yard at Philadelphia, Pennsylvania, on 11 July 1944, USS S-22 was subsequently used as a sonar target at New London, Connecticut, and in tests at the United States Naval Experimental Facility at Minas Basin in Nova Scotia, Canada.

During August of 1945, USS S-22 (SS-127) was struck from the Navy List.

On 2 September 1945, the Japanese signed the instruments of surrender on board battleship USS Missouri...which was anchored in Tokyo Bay, Japan, for that occasion. That action officially ended the Second World War.

The hulk of submarine S-22 was sold for scrapping on 16 November 1945 to the North American Smelting Company of Philadelphia, Pennsylvania.

 

spacing
Main Page
spacing
Return to S-Boat Home Page.
 
spacing

This Information is provided courtesy of Robert (Bob) L. Sminkey CDR(SS) USN ret.

 

spacing

This page updated on November 23, 2003
all rights reserved by Salty's Stamps ©