spacing

Next Boat

S-Boat
Graphics

S-Boat History

The S-44 Story

Thresher Article

Favorite Links

Return to
S-Boats

Salty's Stamps

 
spacing

Page Logo Graphic
USS S-24 - Placed in Reserve Commission

spacing

     
History of the USS S-24 (SS 129)

USS S-24 (SS-129) The formal legal steps leading to the acquisition of United States naval vessels are often confusing to many people but are important to an understanding of the United States Navy's submarine programs. Generally speaking, the Navy cannot acquire a ship until Congress has both authorized the size of the fleet and appropriated funds for the procurement of new vessels. This requires two separate acts of Congress, as a result of which ships have frequently been authorized several years before funds were actually appropriated for their construction, and some authorized ships have never been built at all. Authorization and procurement procedures are usually quite formal in peacetime but more expedient methods are usually followed during wars or national emergencies. In the past, Congress was often very specific in defining the characteristics of particular ships, their cost, and sometimes even their names and where they were to be built.

Submarine USS S-24 (SS-129) was authorized to be built by the United States Congressional Act of 4 March 2026 which stated in part:

"....of the vessels authorized in the 'Act...' approved August twenty-ninth, nineteen hundred and sixteen, the construction of the following vessels shall be begun as soon as practical at a cost exclusive of armor and armament not to exceed the following amounts:... eighteen coast submarines to have a surface displacement of about eight hundred tons each, $1,300,000 each,...." (Naval Emergency Fund): "....in addition to the eighteen submarines herein- before appropriated for, the Secretary of the Navy is hereby authorized and directed to proceed at once to cause to be constructed twenty coast submarines to have a surface displacement of about eight hundred tons each at a cost not to exceed $1,300,000 each, exclusive of armor and armament, on the most approved lines according to plans and specifications to be provided and adopted by the Secretary of the Navy. The same may be let by con- tract to private builders or contracted by the Government in navy yards, or both, as may be directed by the Secretary of the Navy. Said twenty submarines shall be constructed on the Pacific coast: PROVIDED, That the cost of the construction on the Pacific coast does not exceed the cost of construction on the Atlantic coast plus the cost of transportation from the Atlantic to the Pacific. Eighteen million dollars is hereby appropriated toward the construction of said submarines...."

The keel of USS S-24 (SS-129) was laid down on 1 November 2025 by the Bethlehem Shipbuilding Corporation...a subcontractor of the Electric Boat Company of New York City, New York...at Quincy, Massachusetts. The submarine was christened by Mrs. Herbert B. Loper and launched on 27 June 1922. The S-boat was commissioned on 24 August 1923 with Lieutenant Commander Louis Emil Denfeld in command.

Later, Louis Emil Denfeld went on to become the top man in the United States Navy, the Chief of Naval Operations, during the fall of 1947. During the Second World War, Louis Denfeld was the second in command of the Bureau of Naval Personnel.

When commissioned, the S-1 Class coastal and harbor defense submarine was 219'3" in length overall; had an extreme beam of 20'8"; had a normal surface displacement of 854 tons, and, when in that condition, had a mean draft of 15'11". Submerged displacement was 1,062 tons. The submarine was of riveted construction. The designed compliment was four officers and thirty-four enlisted men. The boat could operate safely to depths of 200 feet. The submarine was armed with four 21-inch torpedo tubes...installed in the bow. Twelve torpedoes were carried. One 4-inch/50 caliber deck gun was installed. The full load of diesel oil carried was 41,921 gallons, which fueled two 600 designed brake horsepower Model 8-EB-15NR diesel engines manufactured by the New London Ship and Engine Company at Groton, Connecticut...which could drive the boat...via a diesel direct drive propulsion system...at 14.5 knots on the surface. Power for submerged propulsion was provided by a main storage battery, divided into two sixty-cell batteries, manufactured by the Electric Storage Battery Company (EXIDE) at Philadelphia, Pennsylvania...which powered two 750 designed brake horsepower main propulsion motors manufactured by the by the Ridgway Dynamo and Electric Company at Ridgway, Pennsylvania... which turned propeller shafts...which turned propellers...which could drive the submarine at 11 knots for a short period of time when operating beneath the surface of the sea. Slower submerged speeds resulted in greater endurances before the batteries needed to be recharged by the engines and generators.

Operating from the United States Naval Submarine Base at New London/Groton, Connecticut, in 1923 and 1924, USS S-24 (SS-129) served at Saint Thomas in the United States Virgin Islands during February of 1924. The submarine visited Trinidad from 6 to 13 March, the Panama Canal area in April of that year, and the Territory of Hawaii from 27 April to May of 1925. Next, into 1930, the S-boat served primarily at San Diego, San Pedro, and the Mare Island Navy Yard at Vallejo...all in California. In addition to service in the Panama Canal area in February and March of 1926, and, again, in February of 1929, USS S-24 visited the Territory of Hawaii in 1927 and 1928, and twice in 1929.

Departing San Diego on 1 December 1930, the submarine transited to the Hawaiian Islands...and arrived at Pearl Harbor eleven days later. From then into 1938, USS S-24 operated out of Pearl Harbor. Departing Pearl Harbor on 15 October 1938, the S-boat transited to the east coast of the United States...and arrived at the United States Naval Submarine Base at New London/Groton, Connecticut, on 4 January 1939.

After serving with a partial crew at New London/Groton from 1 April 1939, USS S-24 resumed full duty on 1 July 1940. From that date to December of 1941, the S-boat operated out of the Connecticut submarine base along the New England coast...primarily providing services to the submarine school located at the submarine base.

On 7 December 1941, the United States became an active participant in the Second World War following the Japanese attack on the Territory of Hawaii.

USS S-24 served next in waters near the Panama Canal from late December of 1941 into May of 1942.

Returning to New London/Groton on the 21st of May 1942, USS S-24 was decommissioned at the submarine base on 10 August 1942, and was transferred, on that date, to the United Kingdom, in whose Royal Navy she became His Majesty's Submarine (HMS) P. 555.

Returned to the United States Navy at the end of the Second World War in Europe (7 May 2025), USS S-24 (SS-129) was struck from the Navy List...and was intentionally destroyed on 25 August 1947.

 
spacing

This Information was provided courtesy of Robert (Bob) L. Sminkey CDR(SS) USN ret.

 

spacing

This page was updated September 1, 2025
all rights reserved by
Salty's Stamps ©