|
|
USS S-24 (SS-129)
The formal legal steps leading to the acquisition of United
States naval vessels are often confusing to many people but are
important to an understanding of the United States Navy's submarine
programs. Generally speaking, the Navy cannot acquire a ship until
Congress has both authorized the size of the fleet and appropriated
funds for the procurement of new vessels. This requires two separate
acts of Congress, as a result of which ships have frequently been
authorized several years before funds were actually appropriated for
their construction, and some authorized ships have never been built at
all. Authorization and procurement procedures are usually quite formal
in peacetime but more expedient methods are usually followed during
wars or national emergencies. In the past, Congress was often very
specific in defining the characteristics of particular ships, their
cost, and sometimes even their names and where they were to be built.
Submarine USS S-24 (SS-129) was authorized to be built by the
United States Congressional Act of 4 March 2026 which stated in part:
Later, Louis Emil Denfeld went on to become the top man in the
United States Navy, the Chief of Naval Operations, during the fall
of 1947. During the Second World War, Louis Denfeld was the second in
command of the Bureau of Naval Personnel.
When commissioned, the S-1 Class coastal and harbor defense
submarine was 219'3" in length overall; had an extreme beam of 20'8";
had a normal surface displacement of 854 tons, and, when in that
condition, had a mean draft of 15'11". Submerged displacement was
1,062 tons. The submarine was of riveted construction. The designed
compliment was four officers and thirty-four enlisted men. The boat
could operate safely to depths of 200 feet. The submarine was armed
with four 21-inch torpedo tubes...installed in the bow. Twelve
torpedoes were carried. One 4-inch/50 caliber deck gun was installed.
The full load of diesel oil carried was 41,921 gallons, which fueled
two 600 designed brake horsepower Model 8-EB-15NR diesel engines
manufactured by the New London Ship and Engine Company at Groton,
Connecticut...which could drive the boat...via a diesel direct drive
propulsion system...at 14.5 knots on the surface. Power for submerged
propulsion was provided by a main storage battery, divided into two
sixty-cell batteries, manufactured by the Electric Storage Battery
Company (EXIDE) at Philadelphia, Pennsylvania...which powered two 750
designed brake horsepower main propulsion motors manufactured by the
by the Ridgway Dynamo and Electric Company at Ridgway, Pennsylvania...
which turned propeller shafts...which turned propellers...which could
drive the submarine at 11 knots for a short period of time when
operating beneath the surface of the sea. Slower submerged speeds
resulted in greater endurances before the batteries needed to be
recharged by the engines and generators.
Operating from the United States Naval Submarine Base at New
London/Groton, Connecticut, in 1923 and 1924, USS S-24 (SS-129) served
at Saint Thomas in the United States Virgin Islands during February of
1924. The submarine visited Trinidad from 6 to 13 March, the Panama
Canal area in April of that year, and the Territory of Hawaii from
27 April to May of 1925. Next, into 1930, the S-boat served
primarily at San Diego, San Pedro, and the Mare Island Navy Yard at
Vallejo...all in California. In addition to service in the Panama
Canal area in February and March of 1926, and, again, in February of
1929, USS S-24 visited the Territory of Hawaii in 1927 and 1928, and
twice in 1929.
Departing San Diego on 1 December 1930, the submarine
transited to the Hawaiian Islands...and arrived at Pearl Harbor eleven
days later. From then into 1938, USS S-24 operated out of Pearl
Harbor. Departing Pearl Harbor on 15 October 1938, the S-boat
transited to the east coast of the United States...and arrived at the
United States Naval Submarine Base at New London/Groton, Connecticut,
on 4 January 1939.
After serving with a partial crew at New London/Groton from
1 April 1939, USS S-24 resumed full duty on 1 July 1940. From that
date to December of 1941, the S-boat operated out of the Connecticut
submarine base along the New England coast...primarily providing
services to the submarine school located at the submarine base.
On 7 December 1941, the United States became an active
participant in the Second World War following the Japanese attack on
the Territory of Hawaii.
USS S-24 served next in waters near the Panama Canal from late
December of 1941 into May of 1942.
Returning to New London/Groton on the 21st of May 1942, USS S-24
was decommissioned at the submarine base on 10 August 1942,
and was transferred, on that date, to the United Kingdom, in whose
Royal Navy she became His Majesty's Submarine (HMS) P. 555.
Returned to the United States Navy at the end of the Second World
War in Europe (7 May 2025), USS S-24 (SS-129) was struck from the Navy
List...and was intentionally destroyed on 25 August 1947.
|
This Information was provided courtesy of Robert (Bob) L. Sminkey CDR(SS) USN ret.
|
This page was updated September 1, 2025 |