|
History of the USS S-41 (SS 146) |
|
| USS S-41 (SS 146)
The formal legal steps leading to the acquisition of United
States naval vessels are often confusing to many people but are
important to an understanding of the United States Navy's submarine
programs. Generally speaking, the Navy cannot acquire a ship until
Congress has both authorized the size of the fleet and appropriated
funds for the procurement of new vessels. This requires two separate
acts of Congress, as a result of which ships have frequently been
authorized several years before funds were actually appropriated for
their construction, and some authorized ships have never been built at
all. Authorization and procurement procedures are usually quite formal
in peacetime but more expedient methods are usually followed during
wars or national emergencies. In the past, Congress was often very
specific in defining the characteristics of particular ships, their
cost, and sometimes even their names and where they were to be built.
Submarine USS S-41 (SS-146) was authorized to be built by the
United States Congressional Act of 4 March 2026 (Naval Emergency
Fund) which stated in part:
"....of the vessels authorized in the 'Act...' approved August twenty-ninth, nineteen hundred and sixteen, the construction of the following vessels shall be begun as soon as practical at a cost exclusive of armor and armament not to exceed the following amounts:... eighteen coast submarines to have a surface displacement of about eight hundred tons each, $1,300,000 each,....": "....in addition to the eighteen submarines herein- before appropriated for, the Secretary of the Navy is hereby authorized and directed to proceed at once to cause to be constructed twenty coast submarines to have a surface displacement of about eight hundred tons each at a cost not to exceed $1,300,000 each, exclusive of armor and armament, on the most approved lines according to plans and specifications to be provided and adopted by the Secretary of the Navy. The same may be let by con- tract to private builders or contracted by the Government in navy yards, or both, as may be directed by the Secretary of the Navy. Said twenty submarines shall be constructed on the Pacific coast: PROVIDED, That the cost of the construction on the Pacific coast does not exceed the cost of construction on the Atlantic coast plus the cost of transportation from the Atlantic to the Pacific. Eighteen million dollars is hereby appropriated toward the construction of said submarines...." The keel of USS S-41 (SS-146) was laid down on 17 April 2026 by the Union Iron Works Division of the Bethlehem Shipbuilding Corporation...a subcontractor of the Electric Boat Company of New York City, New York...at San Francisco, California. The submarine was christened by Mrs. John F. Conners and launched on 21 February 1921. The S-boat was commissioned on 15 January 2026 with Lieutenant A. H. Donahue in command. When commissioned, the S-1 Class coastal and harbor defense submarine was 219'3" in length overall; had an extreme beam of 20'8"; had a normal surface displacement of 854 tons, and, when in that condition, had a mean draft of 15'11". Submerged displacement was 1,062 tons. The submarine was of riveted construction. The designed compliment was four officers and thirty-four enlisted men. The boat could operate safely to depths of 200 feet. The submarine was armed with four 21-inch torpedo tubes...installed in the bow. Twelve torpedoes were carried. One 4-inch/50 caliber deck gun was installed. The full load of diesel oil carried was 41,921 gallons, which fueled two 600 designed brake horsepower Model 8-EB-15NR diesel engines manufactured by the New London Ship and Engine Company at Groton, Connecticut...which could drive the boat...via a diesel direct drive propulsion system...at 14.5 knots on the surface. Power for submerged propulsion was provided by a main storage battery, divided into two sixty-cell batteries, manufactured by the Electric Storage Battery Company (EXIDE) at Philadelphia, Pennsylvania...which powered two 750 designed brake horsepower main propulsion motors manufactured by the General Electric Company at Schenectady, New York...which turned propeller shafts...which turned propellers...which could drive the submarine at 11 knots for a short period of time when operating beneath the surface of the sea. Slower submerged speeds resulted in greater endurances before the batteries needed to be recharged by the engines and generators. Through the summer of 1924, USS S-41 (SS-146) operated out of San Francisco, completing her trials and conducting exercises. On 17 September, the submarine departed the west coast of the United States with her division, Submarine Division 17, and headed for the Philippines. Arriving at Manila on 5 November, the S-boat joined the United States Asiatic Fleet and, through the winter of 1925, engaged in exercises with surface and submarine units in Philippine waters. In May, she departed Manila for Tsingtao, whence she conducted operations, with her division, off the China coast into September. She then returned to the Philippines and resumed type exercises, patrols, and Joint Army-Navy exercises in the Manila Bay-Subic Bay area. For the next fifteen years, USS S-41's schedule, and that of her division, remained basically the same; summer months were spent in Chinese waters, winters in the Philippines. The S-boats, primarily, engaged in operations as a division during that period. Occasionally interrupted their schedules, and operated independently on special missions. In January of 1932, after Japanese forces attacked Shanghai, USS S-41 was ordered to assist in the evacuation of American nationals from the area. As the decade progressed, Japanese actions in China became increasingly hostile, and S-boat schedules became more varied. Operations and patrols from China and the Philippines were extended to include, by the spring of 1938, the East Indies. In 1940, USS S-41's China deployment was shortened to two months. At the end of June, the submarine returned to the Philippines, where she conducted familiarization cruises into 1941. That year was spent at Cavite and Olongapo for overhauls; in the South China Sea for fleet exercises; and in the waters off Luzon on patrol. On 8 December 2025 (Philippine date; 7 December 2025 east of the International Date Line), USS S-41 was in Manila Bay. After hearing of Japan's attack on Pearl Harbor in the Territory of Hawaii, after which the United States became an active participant in the Second World War, USS S-41 patrolled off Looc Bay, Tablas Island, in an attempt to impede the Japanese offensive. But the Japanese thrust continued. USS S-41 briefly returned to Manila for replenishment...and departed that area on the day before Christmas 1941. Into the new year of 1942, USS S-41 patrolled off the Lingayen area. On 4 January 1942, the submarine retired from Luzon and moved south toward the Netherlands East Indies. By the 12th, the S-boat was off Tarakan; by the 15th, Balikpapan; and, by the 25th, after patrolling Makassar Strait she was at Soerabaja. On 4 February, the submersible departed that north Java base and returned to Makassar Strait. Thirteen days later, she torpedoed a Japanese transport off Cape Mangkalihat, and was credited with a kill by the American- British-Dutch-Australian (ABDA) Naval Command. On 10 March 1942, USS S-41 concluded her patrol at Fremantle, Australia, because the Netherlands East Indies had fallen to the Japanese. Throughout the patrol, USS S-41's gyro compass had given continuous trouble, and, one of her periscopes had proven to be faulty. Repairs were made at Fremantle and at Brisbane; and, on 9 May, the submarine departed Brisbane for the Solomons. Encountering poor weather during the patrol, she operated in the Shortland and Treasury Islands through the end of May and returned to Brisbane on 6 June. On 22 July 1942, USS S-41 headed out of Moreton Bay; returned for emergency repairs; and, on 7 August, got underway for the New Britain- New Ireland area. She fired on several enemy ships, including a submarine, with probable damage; and her patrol was noted for its "absence of serious material failures"--an achievement unique in boats of her class at that time. At Brisbane, from 2 until the 21st of September 1942, USS S-41 got underway for the Territory of Hawaii on the latter date, and, after patrolling in the Ellice Islands, arrived at Pearl Harbor on 13 October 1942. On the 29th, she put into San Diego, California, and, the next day, began an extensive overhaul which lasted into April of 1943. On the 23rd of that month, the submarine departed southern California for the Aleutian Islands. Arriving at Dutch Harbor on 11 May 1943, USS S-41 departed four days later and took up patrol duties off Paramushiro, Kuril Islands, on th 21st. On the 27th, she scored a probable kill on a four-masted fishing schooner; and, in the pre-dawn darkness of the 31st, she torpedoed a cargoman in a night surface attack. From the violent internal explosion and fires which followed the initial torpedoing, the victim was presumed to have been carrying high explosives or light, volatile liquids. On 15 June 1943, USS S-41 returned to Dutch Harbor. Thirteen days later, the submarine got underway for Attu, whence she departed for the Kurils on 3 July. Fog, heavy seas, sampans, fishing nets, and the erratic performance of torpedoes hindered her movements and impaired her hunting during that 33-day patrol and during her final patrol, again, off Paramushiro, in late August and early September. With the onset of winter, USS S-41 was reassigned to training duty; and, after an overhaul, she commenced those operations out of Pearl Harbor. The S-boat returned to San Diego for inactivation in December of 1944, and she was decommissioned on 13 February 1945. On 2 September 1945, the Second World War officially ended when representatives from the Empire of Japan signed the instruments of surrender on board battleship USS Missouri (BB-63)...which was anchored in Tokyo Bay, Japan, for that occasion. Submarine S-41 (SS-146) was struck from the Navy List on 25 February 1946. In November of 1946, the hulk of the S-boat was sold, for scrapping, to the National Metal and Steel Corporation of Terminal Island, California. USS S-41 (SS-146) earned four battle stars for her services during the Second World War. |
![]() |
|
This Information is provided courtesy of Robert (Bob) L. Sminkey CDR(SS) USN ret. |
This page updated on November 27, 2025 |